Land plots in Saint-Petersburg and Leningrad Region

Sale of land plot in Shushary along Moskovskoe Highway

Object Land plot with the area of 7.7 ha.
Location and description Saint-Petersburg, Pushkinskiy District, Shushary settlement, "Shushary" industrial area.

The land plot is located on the first line of Moskovskoe Highway.
The territory of TOYOTA plant is approximately 1.5 km away.
The distance from the KAD junction along Moskovskoe Highway is about 3 km.

The land plot lies in the immediate vicinity of the KAD, 1 km away from "Lenta" hypermarket. It has smooth relief without any planting.

In the vicinity of the plot there are: "Lenta" hypermarket, "PTK" gas station, warehouse terminals, lumber depot, new warehouse complex for stockpiling bulk foodstuff products (tea, coffee).
Transport accessibility Near the plot there are the roads of 1st and 2nd categories.

Public transport
It is planned to build new metro station "Balkanskaya" in 2015 – 2025.
It is also planned to build high-speed tram railway along Sofyiskaya Street.
Land status Settlement land.
Owned by a legal entity.

As per the General Plan the plot lies within D zone (zone of all types of public business construction, including the construction of residential objects and engineering infrastructure facilities, servicing the zone.).
As per Zoning and Development Plan, the plot is assigned to TD1-2_1 subzone (the subzone for the development of multi-purpose public and commercial objects in suburban and remote districts, lying within the area of influence of the Ring Road around Saint-Petersburg and adjacent branch roads, including the construction of residential objects and engineering infrastructure facilities).
Communications Electricity
Main source – Electric Power Substation № 705.
In the year 2010 it is planned to build "Shushary" Electric Power Substation" for 110 kV. (Agreement of Engagement and Interaction between Saint-Petersburg and RAO UES of Russia reg. №25-C of 01.08.2006).

Heating
No sources of central heating.

Gas supply
Main source – "Southern TETs" Gas Distribution Plant. Output reserve is available.

Water supply
Main source – Southern Waterworks (UVS).
Construction of water pipelines from Korchmino settlement to Pushkin is to be carried out in the year 2007. Construction of new water treatment unit at Water Treatment Station in Kolpino is to be completed in the year 2013. (General Water Discharge Scheme of Saint-Petersburg for the period up to 2015, regarding the outlook of up to 2025, approved by Resolution of the Government of Saint-Petersburg №158725 of 11.12.2007).

Sewage system
Main source – Sewage treatment facilities in the town of Pushkin.
Modernization of sewage treatment facilities in Metallostroy settlement in the year 2013.
Construction of sewage reservoir Shushary – Metallostroy in the year 2013.
Possible use Industrial and business development.
Price $ 50 per sq.m.
Location on the map
Site plan
Land plot location

 ABOUT US    |    SERVICES    |    ANALYTICS    |    LIST OF OBJECTS    |    CONTACTS  © 2006-2018 All copyrights for any materials of the web-site are proprietary to PETERLAND LLC.